Relocation of the Overhauled Chairlift “Topolino–Ovindoli”
The technical overhaul and relocation of the “Topolino” four-seater ski lift—a platter lift with a looped carrying-hauling rope—was successfully completed, combining modernization with improved alignment and compliance to current regulatory standards.

The new installation, featuring an inclined length of 248.72 meters, a vertical drop of 41.40 meters, and 6 line towers (5 support and 1 hold-down), now delivers an hourly capacity of 1,800 people with 34 vehicles at an operating speed of 2.0 m/s. The hydraulic tensioning system at the bottom station and the drive system were inspected and upgraded, reaching a peak power of 90 kW, while maintaining the efficient 180° rope wrap around the drive sheave. The relocation of the lift resulted in improved load distribution and better integration with the surrounding ski slopes, enhancing both performance and safety for users.