Relocation of the Overhauled Chairlift “Belladonna–Lamaccione”
The overhaul, technical upgrade, and relocation of the “Lamaccione” ski lift were successfully completed to improve efficiency, terrain integration, and regulatory compliance.

The project involved repositioning the route, optimizing the elevation profile and tower spacing to enhance operational performance and alignment with the surrounding ski slopes. The main drive system was upgraded with a SICME NP 280 KS-PVA/B3 electric motor rated at 319 kW, delivering 88.6% efficiency, and exceeding power requirements with 177.83 kW at full load and 215.97 kW at startup. The recovery system was equipped with a VM SUN 6105 TE diesel engine (116 kW) and a high-pressure hydraulic system featuring a POCLAIN MS50_0 motor, P35 brake, and REXROTH A4VG 90 pump rated for up to 450 bar. The new configuration significantly enhanced the lift’s accessibility, safety, and compliance with current technical standards, ensuring reliable operation in its updated setting.