Overhaul of the GRAN SASSO Cable Car

Revitalization of the Gran Sasso Cable Car (RB02)
The five-year overhaul and functional revitalization of the bi-cable “Fonte Cerreto – Campo Imperatore” cable car—also known as RB02—was successfully completed in compliance with D.M. 203/2015, with the objective of ensuring operational continuity and safety until the next scheduled general overhaul in 2028. 

GRAFFER Srl | Revisione della funivia del GRAN SASSO

The intervention focused on the replacement and inspection of key mechanical, electrical, and hydraulic components subject to wear, along with thorough non-destructive testing (NDT) on structural elements and critical systems, to guarantee the continued efficiency and safety of the installation. Several targeted interventions were carried out, including: – Repositioning of the carrying ropes – Update of buffers – Rebalancing of vehicles – Enhancement of the ballast rope – Complete overhaul of all technical subsystems, including drives, brakes, trolleys, suspensions, and electrical systems – Thanks to optimized planning and execution, the entire operation was successfully completed within 60 days, and concluded with the issuance of all required compliance certifications. This revitalization marks a key milestone in the lifecycle of the Gran Sasso cable car, ensuring safe and uninterrupted service for the next five years, and reaffirming its strategic role in connecting the valley to the high-altitude station of Campo Imperatore.

GRAFFER Srl | Revisione della funivia del GRAN SASSO
GRAFFER Srl | Revisione della funivia del GRAN SASSO