Complete Overhaul of the ENEL Cable Car “Pantano”
The modernization of the ENEL “Pantano” bi-cable cable car was a comprehensive project focused on enhancing safety, operational efficiency, and regulatory compliance. The intervention began with dismantling operations, which included non-destructive testing on the line towers and stations, deactivation of the electrical system, and the removal of key components such as the drive and return stations, line rollers, vehicles, and tensioning ropes.

Subsequent on-site revisions were carried out on the suspension systems, pulleys, winches, hydraulic units, and buffers, ensuring optimal functionality and long-term reliability. At the same time, new components were manufactured and installed, including custom-designed cabins, electrical equipment, corrected tower alignments, and safety protections along the line—guaranteeing full compliance with current safety standards. The reassembly phase featured the installation of modernized stations, updated vehicles, refurbished line components, and new tensioning ropes, along with an upgraded electrical system. Special attention was given to the control panels, which were modernized to enhance system performance and monitoring. In the final phase, the line towers were repainted, electrical wiring was completed, and the entire system was integrated and tested. Internal trials and final certification confirmed that the cable car now meets all operational and safety standards, ensuring its continued use for ENEL’s personnel transport needs with improved reliability, efficiency, and technical integrity.




